Path: Top -> Journal -> Telkomnika -> 2015 -> Vol 13, No 2: June

Influences of the Input Factors towards Success of An Information System Project

Influences of the Input Factors towards Success of An Information System Project

Journal from gdlhub / 2016-11-17 03:59:31
By : A'ang Subiyakto, Abd. Rahman Ahlan, Mira Kartiwi, Husni Teja Sukmana, Telkomnika
Created : 2015-06-01, with 1 files

Keyword : IS, project success, survey, project stakeholders, PLS-SEM
Url : http://journal.uad.ac.id/index.php/TELKOMNIKA/article/view/1323

This study examines the input factors that were reputed theoretically affecting the information system (IS) project success in term of the processional and causal perspectives. Adopting three of the four dimensions from the McLeod and MacDonell’s (M&M’s) classification project framework dimensions, the study is initiated by inviting the internal project stakeholders in a sampled institution. A stratified sampling then identified 130 people who experienced in the projects as the sample, contacted 90 of the samples via e-mail and distributed the paper-based questionnaire into 40 certain people especially who are on the managerial level. A number of 62 (48%) valid responses, then were analyzed using the partial least squares-structural equation modeling (PLS-SEM) software, i.e. SmartPLS. The significances of the whole path coefficients, the acceptances of the overall hypotheses, the relevances of the three predictors relevances, and the moderate coefficient determination of the IS project success variable may present acceptability of the proposed model for the subsequent studies.

Description Alternative :

This study examines the input factors that were reputed theoretically affecting the information system (IS) project success in term of the processional and causal perspectives. Adopting three of the four dimensions from the McLeod and MacDonell’s (M&M’s) classification project framework dimensions, the study is initiated by inviting the internal project stakeholders in a sampled institution. A stratified sampling then identified 130 people who experienced in the projects as the sample, contacted 90 of the samples via e-mail and distributed the paper-based questionnaire into 40 certain people especially who are on the managerial level. A number of 62 (48%) valid responses, then were analyzed using the partial least squares-structural equation modeling (PLS-SEM) software, i.e. SmartPLS. The significances of the whole path coefficients, the acceptances of the overall hypotheses, the relevances of the three predictors relevances, and the moderate coefficient determination of the IS project success variable may present acceptability of the proposed model for the subsequent studies.

Give Comment ?#(0) | Bookmark

PropertyValue
Publisher IDgdlhub
OrganizationTelkomnika
Contact NameHerti Yani, S.Kom
AddressJln. Jenderal Sudirman
CityJambi
RegionJambi
CountryIndonesia
Phone0741-35095
Fax0741-35093
Administrator E-mailelibrarystikom@gmail.com
CKO E-mailelibrarystikom@gmail.com

Print ...

Contributor...

  • , Editor: sukadi

Downnload...