Path: Top -> Journal -> Jurnal Internasional -> Journal -> Computer
Identification of Factors that Affect the Transitio Time between CMMI Levels from Geographica Region Perspective: An Empirical Study
Identification of Factors that Affect the Transitio Time between CMMI Levels from Geographica Region Perspective: An Empirical Study
2011Journal from gdlhub / 2017-08-14 11:52:31
Oleh : Fahad H. Alshammari , Rodina Ahmad, IAJIT
Dibuat : 2012-06-22, dengan 1 file
Keyword : Software process improvement; CMMI; factors; transition time; empirical study
Subjek : Identification of Factors that Affect the Transitio Time between CMMI Levels from Geographica Region Perspective: An Empirical Study
Url : http://www.ccis2k.org/iajit/PDF/vol.10,no.2/5-4113.pdf
Sumber pengambilan dokumen : Internet
A software industry has been more concerned about Software Process Improvement (SPI). Numerous studies have
been made in development of SPI standards and models, or to identify factors that affect SPI success. However, these studies
did not provide answers to questions about the effect of Geographical Region on the transition time between Capability
Maturity Model Integration (CMMI) levels. And why there are obvious differences in the organizationsÂ’ transition time
between CMMI levels. The objective of this research is to identify the geographical region impact on factors that can affect
the transition time between CMMI levels. We conducted 18 interviews in 15 different software companies to extract the factors
and compare these factors with what are in the literature to avoid redundancy, based on that we designed a questionnaire. We
sent out of 236 requests to participants, 92 responded from 30 companies. We asked the participants to rank each factor on a
five-point scale (high, medium, low, zero and not sure) to determine the effect of each factor. We identified 11 factors from
both data sets that are considered effective factors for the transition time between CMMI levels. And also identified one new
factor (turn over of staff) which was not identified in the literature.
A software industry has been more concerned about Software Process Improvement (SPI). Numerous studies have
been made in development of SPI standards and models, or to identify factors that affect SPI success. However, these studies
did not provide answers to questions about the effect of Geographical Region on the transition time between Capability
Maturity Model Integration (CMMI) levels. And why there are obvious differences in the organizationsÂ’ transition time
between CMMI levels. The objective of this research is to identify the geographical region impact on factors that can affect
the transition time between CMMI levels. We conducted 18 interviews in 15 different software companies to extract the factors
and compare these factors with what are in the literature to avoid redundancy, based on that we designed a questionnaire. We
sent out of 236 requests to participants, 92 responded from 30 companies. We asked the participants to rank each factor on a
five-point scale (high, medium, low, zero and not sure) to determine the effect of each factor. We identified 11 factors from
both data sets that are considered effective factors for the transition time between CMMI levels. And also identified one new
factor (turn over of staff) which was not identified in the literature.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | gdlhub |
Organisasi | IAJIT |
Nama Kontak | Herti Yani, S.Kom |
Alamat | Jln. Jenderal Sudirman |
Kota | Jambi |
Daerah | Jambi |
Negara | Indonesia |
Telepon | 0741-35095 |
Fax | 0741-35093 |
E-mail Administrator | elibrarystikom@gmail.com |
E-mail CKO | elibrarystikom@gmail.com |
Print ...
Kontributor...
- , Editor: fachruddin
Download...
Download hanya untuk member.
5
File : 5.0.PDF
(1337672 bytes)